Frequently Asked Questions
Corporate Green Power Programme
NEDA participation
Preliminary check/study/PSS
Can interconnection solution be changed later if the PSS is not favourable?
If PSS rejected by TNB at NEDA stage, does it meant the CGPP application will be fully rejected?
Is Full PSS is required for NEDA? or PSS stage 1?
Please advice if 132kV substation that is not in the list is allowed if preliminary check with PSS consultant shows that injection is feasible.
Settlement
Can the spare capacity be sold to the pool?
What does it mean by bid is successful for large merchant generator? Is there any risk any energy generated is not being paid? Or should the large merchant generator will be paid same as the price taker?
How SMP is determined? is the SMP change every 30 mins or SB shall declare a monthly average SMP between 7am to 7pm similar to NEM NOVA SMP declaration?
If the Corporate Consumer consumed 1000kWh during day and 500kWh during night. The solar plant produces 1500kWh (basically during daytime only) will the solar plant producer being paid 1500kWh or 1000kWh?
In the event that the price agreed between corporate consumer = SMP, the corporate consumer will still need to pay the energy utility company the normal electricity tariff? ie. payment (toll) to use the transmission and distribution system.