CRESS
With reference to section 6.5, we understand that a RED is allowed to contract with more than 1 Green Consumer, but can a RED have more than 1 project site for 1 Green Consumer? Example 1: Green Consumer with a demand of 150 MW under 2 site locations (100
Under the Guidelines, a Green Consumer is allowed to source green electricity from more than one RED up to its maximum energy as declared in the CRESA with the EUC.
CRESS
Are there any detailed guidelines on requirements to include community-scale battery storage?
What are the components in SAC?
Can lower System Access Charge (SAC) for Longer-Hour Batteries be considered?
What is the System Access Charge (SAC) for Non-Solar Technologies (e.g., Biomass/Biogas)?
What is excess energy?